Close

    Press Release

    Filter by:

    Shri K.N. Vyas takes over as Director Bhabha Atomic Research Centre (BARC)

    Shri K. N. Vyas, Distinguished Scientist and Associate Director, Reactor Projects Group of the Bhabha Atomic Research Centre (BARC) today…

    Chief Minister of Gujarat lays foundation stone for Sludge Hygienisation Plant on 30 January, 2016, Ahmedabad

    Radiation Technology for Cleaner and Healthier India Chief Minister Gujarat lays foundation stone for Sludge Hygienisation Plant on 30 January,…

    Press Release on Programme of Action for Localisation of Manufacturing in India for Russian-designed Nuclear Power Plants (24-December-2015)

    During the visit of Prime Minister Narendra Modi to Moscow on December 23-24,2015 for the Annual India-Russia Summit with President…

    Press Release from UCIL on Times of India news report dated 15th December, 2015

    This has reference to the news item “Indian turns blind eye to radioactive waste leaking from J’khand mine: US report”…

    AERB Press Release- No radiation leakage in consignment arrived by Turkish airlines at Delhi airport

    Atomic Energy Regulatory Board (AERB) and the Department of Atomic Energy (DAE) have received intimation on suspected radioactivity leakage at…

    Press Release on India based Neutrino Observatory

    The India-based Neutrino Observatory (INO) Project is a multi-institutional effort aimed at building a world-class underground laboratory with a rock…

    Chairman AEC’s Statement at 58th IAEA General Conference (24-09-2014)

    International Atomic Energy Agency 58th General Conference, Vienna, 24 September 2014 Statement by Dr. Ratan Kumar Sinha, Chairman of the…

    Rawatbhata Unit 5 sets record 765 days continuous run

    Trailblazing Performance of 765 Days of Continuous Run Yields Second Place for RAPS-5 Globally RAWATBHATA. September 6, 2014 RAPS-5, the…

    Kudankulam Unit 1 attains full power

    Kudankulam unit-1 the largest nuclear power reactor in the country attained its full power of 1000 MW at 1320 hrs…

    Kudankulam Unit 1 synchronised to the grid

    The First Unit of Kudankulam Nuclear Power Project (KKNPP), is synchronized to the grid on 22.10.2073 at 02:45 hours and…